top of page

Frontier Estate Stages 1-6

Hamilton Civil + Asphalts is proud to be delivering the full civil works package for Frontier Estate, a large-scale residential subdivision located in the heart of Te Awamutu. Spanning multiple stages of development, this project will provide high-quality housing infrastructure to support one of the region’s fastest-growing communities.

Our involvement in Stages 1–6 covers a wide range of critical civil works, reinforcing our reputation for delivering technically sound, on-time solutions across residential developments.

Scope of Works

  • Installation of stormwater, wastewater, and potable water systems, designed and constructed in accordance with local authority and engineering requirements.

  • Full pavement build-up for the subdivision’s internal roading network, including subgrade preparation, basecourse laying, and asphalt surfacing.

  • Construction of kerb and channel, footpaths, vehicle crossings, and structural concrete elements throughout the subdivision.

  • Coordination with utility providers for power, fibre, gas, and telecommunications to ensure seamless infrastructure integration and future-proofed services.

  • Delivery of streetscaping and green space enhancements, including topsoiling, planting, and shaping of berms and public areas.

  • Implementation of erosion and sediment control plans, stormwater protection, and dust mitigation — ensuring compliance with environmental management standards throughout construction.

This project showcases Hamilton Civil + Asphalts’ ability to deliver residential infrastructure at scale — with precision, safety, and coordination at every step. Our hands-on approach, technical capability, and strong stakeholder communication are key to the successful delivery of Frontier Estate.

frontier estate4.jpg
frontier estate3.jpg
frontier estate 2.jpg
bottom of page